Project Name: Tom Craig Centre

What we did

This community centre refurbishment involved a comprehensive upgrade to both the building fabric and internal facilities. The existing felt roof was stripped and replaced with a new single-ply membrane system, including insulation, roof decking, upstands and new flashings. The existing slate roof was also stripped and renewed, with all rooflight flashing kits replaced.

Internally, the existing toilet facilities were stripped out, with structural alterations undertaken to accommodate the revised layout. Areas of dry rot affecting timber and masonry were carefully removed and treated, with replacement second-fix joinery installed.

New toilet and store room facilities were created, incorporating new partitions, ceilings, sanitaryware, vinyl flooring and tiling. Existing timber floors were fully stripped and re-lacquered, with decoration works completed throughout. Electrical works included new lighting throughout the building, delivering a refreshed, functional and fully upgraded community facility.

Scope of Works

 

  • Structural Alterations
  • Plumbing
  • Roofing
  • Dry Rot Treatment
  • Joinery
  • Power & Lighting
  • Toilets
  • Decorations
  • Flooring